RowdySearch

CSM 5033 · Construction Cost Estimating

1 professor has taught this class

CSM 5033 Construction Cost Estimating has been taught by 1 professor at UTSA. Across 5 sections, the median grade was A and 0% of students withdrew.

Compare in Analytical Mode
Median Grade (Every Professor)A
BluebookMedian of 3 sections
Instructor4.7 / 5
Course4.6 / 5

None of its professors are on Rate My Professors

Grade breakdown24 grades
Average GPA3.88
A's88%
D's and F's0%
Withdrew0%

Grades in CSM 5033 (Every Professor)

88%
A
13%
B
0%
C
0%
D
0%
F
0%
W
Based on 24 grades
Every grade
GradeStudentsPercent
A2188%
B313%

Percentages are out of everyone who got a letter grade or withdrew (W). IN, IW, and IF are incompletes.

Latest syllabus

1 professor, most recent first

Professor
Jiannan CaiAll their classesA3.8888%0%0%4.6—5Spring 2026